  1. Q21Before each work shift on a scaffold, and after any event that could affect its structural integrity, OSHA requires that the scaffold be inspected by:

    • AA licensed structural engineer
    • BAny OSHA-10 certified worker
    • CA competent person
    • DThe scaffold manufacturer's representative
    Show answer

    ✓ Correct answer: C. A competent person

    29 CFR 1926.451(f)(3) requires a competent person to inspect scaffolds and scaffold components before each work shift and after any occurrence that could affect structural integrity.

    Topic: OSHA 30-Hour Construction

  2. Q22Which of the following is a correct requirement for access to scaffold platforms more than 2 feet above or below a point of access?

    • AWorkers may jump across from an adjacent structure at the employer's discretion
    • BWorkers may use the scaffold cross braces as a ladder if they are sufficiently rigid
    • CAccess requirements only apply to suspended scaffolds, not supported scaffolds
    • DA portable ladder, hook-on ladder, attachable ladder, stair tower, ramp, or walkway must be provided
    Show answer

    ✓ Correct answer: D. A portable ladder, hook-on ladder, attachable ladder, stair tower, ramp, or walkway must be provided

    29 CFR 1926.451(e)(1) requires that when scaffold platforms are more than 2 feet above or below a point of access, proper means such as portable ladders, hook-on ladders, stair towers, ramps, or walkways must be provided; cross braces are explicitly prohibited as access.

    Topic: OSHA 30-Hour Construction

  3. Q23A competent person overseeing scaffold work discovers a plank that is cracked and deflecting beyond acceptable limits. What is the correct action?

    • AImmediately remove the defective plank from service and replace it before workers use the scaffold
    • BTag the plank and allow it to remain in service until the end of the shift
    • CNotify OSHA before removing the plank from service
    • DReinforce the plank with duct tape and continue work with reduced loads
    Show answer

    ✓ Correct answer: A. Immediately remove the defective plank from service and replace it before workers use the scaffold

    29 CFR 1926.451(f)(3) requires a competent person to remove defective scaffold components from service immediately; allowing continued use of a known defective component violates the standard.

    Topic: OSHA 30-Hour Construction

  4. Q24Under OSHA's personal fall arrest system requirements, what is the maximum free-fall distance allowed before the system must begin to arrest a fall?

    • A12 feet
    • B3.5 feet
    • C6 feet
    • D10 feet
    Show answer

    ✓ Correct answer: C. 6 feet

    29 CFR 1926.502(d)(16)(iii) limits free fall to no more than 6 feet and requires the system to bring the worker to a complete stop with no more than 3.5 feet of deceleration distance.

    Topic: OSHA 30-Hour Construction

  5. Q25Which of the following workers on a two-point adjustable suspension (swing stage) scaffold is required to use a personal fall arrest system rather than relying solely on guardrails?

    • AWorkers on swing stages below 25 feet only; guardrails alone suffice above 25 feet
    • BOnly supervisors and competent persons on the scaffold
    • COnly workers who are not tied off to the building structure
    • DAll workers on the swing stage, in addition to guardrails, because both are required simultaneously
    Show answer

    ✓ Correct answer: D. All workers on the swing stage, in addition to guardrails, because both are required simultaneously

    29 CFR 1926.502(d) and 1926.451(g)(3) require each worker on a two-point adjustable suspension scaffold to be protected by both guardrails and a personal fall arrest system — the two systems are required simultaneously, not as alternatives.

    Topic: OSHA 30-Hour Construction

  6. Q26A competent person for fall protection and scaffolds must be able to do which of the following that an ordinary worker is NOT expected to do?

    • AWear personal protective equipment
    • BIdentify existing and predictable hazards AND have the authority to take prompt corrective measures to eliminate them
    • CFollow the site safety plan written by the employer
    • DReport hazards to the safety officer for eventual correction
    Show answer

    ✓ Correct answer: B. Identify existing and predictable hazards AND have the authority to take prompt corrective measures to eliminate them

    29 CFR 1926.32(f) defines a competent person as one who can identify hazardous or dangerous conditions AND who has authorization to take prompt corrective measures — the authority to act, not just report, is what distinguishes a competent person from an ordinary worker.

    Topic: OSHA 30-Hour Construction

  7. Q27Which of the following is considered one of OSHA's 'Focus Four' leading causes of construction fatalities?

    • AChemical burns
    • BRepetitive strain injuries
    • CHearing loss
    • DElectrocutions
    Show answer

    ✓ Correct answer: D. Electrocutions

    OSHA identifies Electrocutions as one of the Focus Four hazards responsible for the majority of construction worker deaths, alongside Falls, Struck-By, and Caught-In/Between incidents (29 CFR 1926, Subpart K).

    Topic: OSHA 30-Hour Construction

  8. Q28Ground Fault Circuit Interrupters (GFCIs) are required on construction sites when using temporary power. What is the primary purpose of a GFCI?

    • ATo prevent overloading a circuit by tripping when current draw is too high
    • BTo ensure that all tools connected to the circuit are properly grounded
    • CTo detect a difference in current between the hot and neutral conductors and interrupt the circuit
    • DTo protect equipment from voltage surges caused by lightning
    Show answer

    ✓ Correct answer: C. To detect a difference in current between the hot and neutral conductors and interrupt the circuit

    A GFCI monitors the difference in current between the hot and neutral conductors and trips the circuit within milliseconds when a ground fault is detected, protecting workers from electrocution per 29 CFR 1926.404(b)(1).

    Topic: OSHA 30-Hour Construction

  9. Q29Under the OSHA assured equipment grounding conductor program, which of the following must be performed before equipment is placed into service on a construction site?

    • AA licensed electrician must inspect and certify every tool each morning
    • BEach tool must be registered with the site safety officer before first use
    • CAll extension cords must be replaced every 30 days regardless of condition
    • DVisual inspections and continuity tests of cords, plugs, and equipment must be documented
    Show answer

    ✓ Correct answer: D. Visual inspections and continuity tests of cords, plugs, and equipment must be documented

    29 CFR 1926.404(b)(1)(iii) requires that under an assured equipment grounding conductor program, all cord sets, receptacles, and equipment be visually inspected and tested for proper grounding before first use and after any incident that may have damaged them, with results documented.

    Topic: OSHA 30-Hour Construction

  10. Q30When working near overhead power lines where the voltage is unknown, what is the minimum safe approach distance a worker or equipment must maintain?

    • A3 feet
    • B6 feet
    • C20 feet
    • D10 feet
    Show answer

    ✓ Correct answer: D. 10 feet

    29 CFR 1926.1408 and 1926.416(a)(1) require a minimum clearance of 10 feet from overhead power lines when voltage is unknown or up to 50 kV, to protect workers from electrocution from arc flash or contact.

    Topic: OSHA 30-Hour Construction

Free practice here. Timed mocks when you are ready.

Use the free OSHA 30 Construction Prep sample, download the PDF, then unlock web-based timed mock exams for a full exam rehearsal.

Download PDFStart practice test