  1. Q21When verifying the installation of a PV array mounting system, which document should be referenced to confirm proper rail spacing?

    • ALocal zoning regulations
    • BNFPA 70E safety guidelines
    • CEnergy efficiency guidelines
    • DManufacturer installation instructions
    Show answer

    ✓ Correct answer: D. Manufacturer installation instructions

    Manufacturer installation instructions provide specific requirements for mounting system components, including rail spacing requirements which are critical for ensuring structural integrity and warranty compliance.

  2. Q22During a visual inspection of a rooftop PV system, you notice that the array does not match the layout in the approved design documents. What is the appropriate next step?

    • AIgnore the discrepancies if the system is functioning
    • BRemove and reinstall the entire system
    • CDocument the discrepancies and determine if the changes affect system performance or code compliance
    • DImmediately fail the system inspection
    Show answer

    ✓ Correct answer: C. Document the discrepancies and determine if the changes affect system performance or code compliance

    When an installation does not match the approved design, it's essential to document the discrepancies and determine if the changes affect system performance or code compliance before proceeding with commissioning.

  3. Q23According to NEC requirements, what must be visible on all PV system disconnecting means?

    • AWarranty expiration date
    • BClear labeling indicating their purpose
    • CManufacturer logo only
    • DInstallation date
    Show answer

    ✓ Correct answer: B. Clear labeling indicating their purpose

    The NEC requires that all disconnecting means be clearly labeled to indicate their purpose and the equipment they control, ensuring safety during maintenance or emergencies.

  4. Q24During a mechanical inspection of module mounting, what should be verified regarding the mounting hardware?

    • AAll hardware is properly installed according to manufacturer specifications
    • BAll hardware is painted to match the roof color
    • CHardware is from a single manufacturer only
    • DHardware is accessible without special tools
    Show answer

    ✓ Correct answer: A. All hardware is properly installed according to manufacturer specifications

    Verifying that all hardware is properly installed according to manufacturer specifications is critical for ensuring the structural integrity of the array and preventing failures during high wind or snow events.

  5. Q25Which of the following is a critical component of a visual inspection for ground-mounted PV arrays?

    • AAesthetic appearance of the array
    • BPresence of wildlife barriers
    • CProximity to property lines
    • DVerification of proper grounding
    Show answer

    ✓ Correct answer: D. Verification of proper grounding

    Verification of proper grounding is critical for safety and code compliance in ground-mounted arrays, as it provides protection against electrical faults and lightning.

  6. Q26When inspecting electrical conduit installations for a PV system, what NEC requirement must be verified?

    • AConduit is buried at least 3 feet deep
    • BConduit is made of a specific material
    • CConduit is properly supported and secured at required intervals
    • DConduit is color-coded by voltage
    Show answer

    ✓ Correct answer: C. Conduit is properly supported and secured at required intervals

    The NEC requires proper support and securing of conduit at specified intervals to prevent sagging, damage, and potential conductor insulation issues over time.

  7. Q27What document should be referenced to verify that the correct modules are installed in a PV system?

    • AOSHA workplace safety guidelines
    • BApproved design specifications
    • CModule recycling guide
    • DRegional solar incentive program
    Show answer

    ✓ Correct answer: B. Approved design specifications

    The approved design specifications list the exact module make and model that should be installed, ensuring the system meets expected performance and compatibility requirements.

  8. Q28During visual inspection of a PV system, you notice module frames in contact with the roof surface. What potential issue does this represent?

    • APotential for water damming and roof leaks
    • BIncreased system efficiency
    • CImproved heat dissipation
    • DEnhanced wind resistance
    Show answer

    ✓ Correct answer: A. Potential for water damming and roof leaks

    Module frames in contact with the roof surface can cause water damming, leading to roof leaks and damage over time, and may also indicate improper mounting that could affect array integrity.

  9. Q29When inspecting module installations, what should be verified regarding the modules' orientation?

    • AModules face true magnetic north
    • BModules are arranged in alphabetical order by serial number
    • CModules are installed to maximize aesthetic appearance
    • DModules are oriented as specified in the approved design
    Show answer

    ✓ Correct answer: D. Modules are oriented as specified in the approved design

    The module orientation should match the approved design to ensure optimal energy production as specified in the system performance calculations.

  10. Q30According to electric service provider requirements, where must a utility-accessible disconnect switch typically be located?

    • AAdjacent to the inverter regardless of location
    • BOn the roof near the array
    • CAt the service entrance or meter location
    • DInside the customer's garage
    Show answer

    ✓ Correct answer: C. At the service entrance or meter location

    Most electric service providers require the utility-accessible disconnect to be located at the service entrance or meter location for safety and easy access during emergencies.

Free practice here. Timed mocks when you are ready.

Use the free PVCMS Test Prep sample, download the PDF, then unlock web-based timed mock exams for a full exam rehearsal.