PVSI Test Prep Exam Questions & Answers 2026 (11–20)

PVSI Test Prep practice questions and answers 2026. Tap an option to test yourself — you'll see the correct answer and a plain-English explanation for every question. Free, no login.

Practise PVSI Test Prep questions free, download the PDF, or unlock timed mock exams when you are ready.
Multiple choice — pick the best answer, then reveal it
  1. Q11Which detail must be included in the documentation for a battery energy storage system coupled with PV?

    • AMarketing materials about battery benefits
    • BBattery capacity and chemistry information
    • CBattery color options
    • DManufacturing plant location
    Show answer

    ✓ Correct answer: B. Battery capacity and chemistry information

    Battery capacity and chemistry information is essential for safety evaluation, as different battery technologies have specific hazards, ventilation requirements, and fire suppression needs that must be documented for code compliance.

  2. Q12What is the main purpose of checking string sizing calculations during document review?

    • ATo verify compatibility with inverter voltage operating ranges
    • BTo maximize aesthetic appearance
    • CTo reduce installation time
    • DTo minimize module shipping costs
    Show answer

    ✓ Correct answer: A. To verify compatibility with inverter voltage operating ranges

    Checking string sizing calculations ensures that the number of modules in series is compatible with the inverter's voltage operating range, preventing potential damage or safety issues from voltage extremes.

  3. Q13What key information should be included in an inspection report when code violations are found?

    • APersonal opinions about the installer
    • BSuggestions for alternative system designs
    • CComparisons to neighboring installations
    • DSpecific code references for each violation
    Show answer

    ✓ Correct answer: D. Specific code references for each violation

    Specific code references are essential in violation reports as they clearly identify which requirements aren't being met, providing clear guidance for corrections and legal justification for required changes.

  4. Q14When reviewing PV system documentation, what information is necessary to verify proper grounding?

    • AInverter wireless network settings
    • BPanel color preferences
    • CGrounding electrode system details
    • DModule cleaning schedule
    Show answer

    ✓ Correct answer: C. Grounding electrode system details

    Grounding electrode system details are necessary to verify proper grounding as they show how the PV system is connected to earth, which is critical for safety and lightning protection.

  5. Q15What should an inspector document when examining labeling for a PV system disconnect?

    • AThe installer's logo placement
    • BClear identification of the disconnect's purpose and location
    • CThe brand name of the disconnect
    • DThe manufacturing date code
    Show answer

    ✓ Correct answer: B. Clear identification of the disconnect's purpose and location

    Clear identification of the disconnect's purpose and location is critical documentation as it ensures emergency responders can quickly locate and operate disconnects when needed.

  6. Q16When reviewing plans for a ground-mounted PV array, which documentation element requires verification?

    • ASetback distances from property lines
    • BGrass type surrounding the array
    • CDecorative fencing options
    • DArray visibility from scenic roads
    Show answer

    ✓ Correct answer: A. Setback distances from property lines

    Setback distances from property lines are critical for ground-mounted arrays as they ensure compliance with local zoning requirements and fire access needs.

  7. Q17What must an inspector verify when reviewing documentation for a PV system on a historic building?

    • ABuilding age verification
    • BOriginal architect's biography
    • CNeighborhood development timeline
    • DApproval from historic preservation authorities
    Show answer

    ✓ Correct answer: D. Approval from historic preservation authorities

    Approval from historic preservation authorities is essential for PV installations on historic buildings as these structures often have special requirements and restrictions that must be documented and followed.

  8. Q18What information in the PV system documentation helps verify proper conductor ampacity?

    • ACable manufacturer's company history
    • BShipping method for materials
    • CConductor specifications and temperature correction factors
    • DWire color preferences
    Show answer

    ✓ Correct answer: C. Conductor specifications and temperature correction factors

    Conductor specifications and temperature correction factors are essential for verifying proper ampacity as they show whether the wiring can safely handle the maximum current under the expected environmental conditions.

  9. Q19When documenting deviations from approved plans, what should an inspector require from the installer?

    • AWaiver of future warranty claims
    • BProfessional engineering approval for significant changes
    • CVerbal promise to fix issues later
    • DExtra payment for expedited review
    Show answer

    ✓ Correct answer: B. Professional engineering approval for significant changes

    Professional engineering approval is necessary for significant deviations as it ensures that the changes maintain system safety and performance in accordance with applicable codes and standards.

  10. Q20What is the primary purpose of reviewing PV system commissioning documentation?

    • ATo verify proper system testing and functionality
    • BTo establish installation timeline
    • CTo document worker credentials
    • DTo calculate tax incentives
    Show answer

    ✓ Correct answer: A. To verify proper system testing and functionality

    The primary purpose of reviewing commissioning documentation is to verify that the system has been properly tested and functions as designed, ensuring all safety features and performance parameters are operational before final approval.