HomeCPIM Production Mgmt PrepQuestions 11–20
CPIM Production Mgmt PrepPart 2 of 3

CPIM Production Mgmt Prep Exam Questions & Answers 2026 (11–20)

CPIM Production Mgmt Prep practice questions and answers 2026. Tap an option to test yourself — you'll see the correct answer and a plain-English explanation for every question. Free, no login.

Practise CPIM Production Mgmt Prep questions free, download the PDF, or unlock timed mock exams when you are ready.
Multiple choice — pick the best answer, then reveal it
  1. Q11In the XYZ inventory management system, which principle is best applied to manage "Z" category items?

    • AFocus primarily on maximizing sales for these items
    • BReduce stock levels for cost efficiency
    • CMaintain ample stock to avoid disruptions
    • DEnsure stringent stock control to minimize loss
    Show answer

    ✓ Correct answer: C. Maintain ample stock to avoid disruptions

    The XYZ inventory system classifies items based on sales volume and criticality. 'Z' items are considered low value or less critical but may have high volume. Therefore, maintaining ample stock of 'Z' items is important to avoid interruptions in operations, as the cost of stock-out scenarios outweighs the cost of maintaining stock.

  2. Q12An organization is introducing a new product, with expected demand of 5000 units annually. Each order costs $50, and the annual holding cost per unit is $2. Calculate the Economic Order Quantity (EOQ) using the data below. Variable Value Annual Demand (D) 5000 units Order Cost (S) $50 per order Holding Cost (H) $2 per unit per year

    • A100 units
    • B250 units
    • C400 units
    • D500 units
    Show answer

    ✓ Correct answer: D. 500 units

    To calculate the EOQ, use the formula $$Q^* = \sqrt{\left(\frac{2DS}{H}\right)}$$. Given : D = 5000 units/year, S = $50/order, H = $2/unit/year. Substitute into the EOQ formula: $$Q = \sqrt{\frac{2 \times 5000 \times 50}{2}}$$. This simplifies to $$Q = \sqrt{250,000} = 500$$ units.

  3. Q13In the framework of Sales & Operations Planning (S&OP), identify the key process that acts as the intermediary between demand forecasting and capacity planning by analyzing production efficiency. Demand Forecast Accuracy (%) Capacity Available (Units) Actual Output (Units) 90 1000 850 85 1200 1020 95 900 855

    • AMaster scheduling
    • BDistribution planning
    • CProduction planning
    • DInventory management
    Show answer

    ✓ Correct answer: A. Master scheduling

    Master scheduling is the process that coordinates S&OP by taking demand forecasts and translating them into a feasible production schedule that aligns with capacity limitations. Efficiency is calculated using: $$\text{Efficiency} = \frac{\text{Actual Output}}{\text{Capacity Available}} \times 100\%$$ Utilization is calculated using: $$\text{Utilization} = \frac{\text{Capacity Requirements}}{\text{Capacity Available}} \times 100\%$$

  4. Q14Which of the following actions best represents the role of advanced logistics systems in a retail environment?

    • AOptimize distribution routes
    • BSchedule deliveries to a bottleneck distribution center
    • CMaintain higher inventory levels at distribution centers
    • DUtilize transport capacity efficiently
    Show answer

    ✓ Correct answer: A. Optimize distribution routes

    Answer: Optimize distribution routes Advanced logistics systems focus on coordinating deliveries to minimize transportation costs, strategically planning routes and schedules to maximize efficiency and reduce waste in the transportation network.

  5. Q15In a subscription-based service industry, what S&OP demand information input is crucial to forecast customer demand accurately for strategic planning?

    • ACustomer subscription renewal rates
    • BProduction lead times
    • CInventory levels
    • DProduct design specifications
    Show answer

    ✓ Correct answer: A. Customer subscription renewal rates

    Answer: Customer subscription renewal rates In a subscription-based service industry, understanding customer retention and renewal rates is key to accurate demand forecasting. These rates provide insight into the steady demand for services, which is vital for S&OP. Production lead times and inventory levels are not as relevant in this context.

  6. Q16In a modern warehouse management system, which RFID tag function relates closest to the concept of backflushing? RFID Tag Description 001 Monitors stock replenishment 002 Tracks goods movement 003 Automatically deducts dispatched items from inventory 004 Alerts for low inventory levels

    • AMonitors stock replenishment
    • BTracks goods movement
    • CAlerts for low inventory levels
    • DAutomatically deducts dispatched items from inventory
    Show answer

    ✓ Correct answer: D. Automatically deducts dispatched items from inventory

    The concept of backflushing in manufacturing is about automatically deducting components from inventory as items are produced. Similarly, the RFID tag function that automatically deducts dispatched items serves a similar purpose of streamlining inventory processes by eliminating manual adjustments.

  7. Q17In a manufacturing facility experiencing sudden fluctuations in its production schedules due to an unexpected surge in orders, which of the following strategies could a production manager implement to stabilize the schedules and reduce system disruptions?

    • AOnly revise production schedules once per month
    • BExtend the order time fence period
    • CIncrease the number of firm planned orders
    • DIgnore fluctuations in order input
    Show answer

    ✓ Correct answer: C. Increase the number of firm planned orders

    Answer: Increase the number of firm planned orders. By increasing firm planned orders, the production manager reduces the frequency of changes to the production schedule, minimizing system disruptions. Ignoring fluctuations may result in production inefficiencies, revising schedules less frequently can leave orders unoptimized, and extending the order time fence period might delay reaction to genuine changes.

  8. Q18Given the resources below, calculate the equivalent weeks required to complete a construction project requiring 160 hours of labor. Resource Quantity Unit Workers 4 workers Work hours per day 8 hours Utilization 85% Efficiency 75% Total required hours 160 hours

    • A1.57 weeks
    • B2 weeks
    • C0.5 weeks
    • D3 weeks
    Show answer

    ✓ Correct answer: A. 1.57 weeks

    Calculate the daily labor capacity using the formula: $$\text{Daily labor capacity} = \text{Workers} \times \text{Work hours per day} \times \text{Utilization} \times \text{Efficiency}$$ Daily labor capacity = $$4 \times 8 \times 0.85 \times 0.75 = 20.4$$ hours Next, find the equivalent weeks: $$\text{Equivalent weeks} = \frac{160}{20.4} / 5 \approx 1.57$$ weeks Therefore, the project requires approximately 1.57 weeks.

  9. Q19Which of the following is not typically included with a shipment leaving a distribution center?

    • AHuman Resources Report
    • BPacking Slip
    • CShipping Label
    • DDelivery Instructions
    Show answer

    ✓ Correct answer: A. Human Resources Report

    Answer: Human Resources Report A shipment leaving a distribution center usually includes documents like packing slips, shipping labels, delivery instructions, and invoices. These documents ensure the shipment is managed properly but do not include internal reports like human resources reports, which are irrelevant to the shipping process.

  10. Q20Inputs to a demand forecast include all except which of the following?

    • AMarket trends
    • BEconomic indicators
    • CProduction schedule
    • DHistorical sales data
    Show answer

    ✓ Correct answer: C. Production schedule

    Answer: Production schedule The production schedule is an output derived from the demand forecast and other planning activities. Inputs to a demand forecast generally include historical sales data, market trends, and economic indicators, which help predict future demand. The production schedule, however, is not an input to the forecast but rather an output developed based on the forecast.

Free practice here. Timed mocks when you are ready.

Use the free CPIM Production Mgmt Prep sample, download the PDF, then unlock web-based timed mock exams for a full exam rehearsal.