HomeMaster Electrician Exam Prep 2Questions 11–20
Master Electrician 2Part 2 of 3

Master Electrician 2 Exam Questions & Answers 2026 (11–20)

Master Electrician 2 practice questions and answers 2026. Tap an option to test yourself — you'll see the correct answer and a plain-English explanation for every question. Free, no login.

Practise Master Electrician 2 questions free, download the PDF, or unlock timed mock exams when you are ready.
Download PDFWatch video
Multiple choice — pick the best answer, then reveal it
  1. Q11In NEC text, the word 'shall' indicates:

    • AA recommended practice that is optional
    • BA mandatory requirement
    • CA permissive rule that allows alternatives
    • DAn exception to the general rule
    Show answer

    ✓ Correct answer: B. A mandatory requirement

    Per NEC 90.5, 'shall' denotes a mandatory requirement. 'Shall not' is a mandatory prohibition. 'Should' indicates a recommendation, and 'shall be permitted' indicates a permissive rule.

    Topic: Code Administration & Safety

  2. Q12The phrase 'shall be permitted' in NEC text signifies:

    • AMandatory installation
    • BA code violation waiver
    • CA future requirement
    • DA permissive allowance
    Show answer

    ✓ Correct answer: D. A permissive allowance

    NEC 90.5(B) defines 'shall be permitted' as identifying options or alternative methods. It is not a mandate but a statement that the Code allows the described practice.

    Topic: Code Administration & Safety

  3. Q13OSHA's general-industry electrical standard is contained primarily in which part of 29 CFR 1910?

    • ASubpart S (1910.301–1910.399)
    • BSubpart K (1910.141–1910.150)
    • CSubpart E (1910.35–1910.39)
    • DSubpart T (1910.401–1910.440)
    Show answer

    ✓ Correct answer: A. Subpart S (1910.301–1910.399)

    OSHA 29 CFR 1910 Subpart S covers electrical safety in general industry workplaces. It addresses design safety standards and safety-related work practices.

    Topic: Code Administration & Safety

  4. Q14OSHA 29 CFR 1910.333 establishes the lockout/tagout requirements for energized electrical equipment. Which of the following is NOT a required element of a proper lockout procedure under this standard?

    • ANotify affected employees
    • BShut down the equipment using established stopping procedures
    • CPermanently remove the energy-isolating device after work
    • DRelease or restrain all stored energy
    Show answer

    ✓ Correct answer: C. Permanently remove the energy-isolating device after work

    OSHA 1910.333 and the broader LOTO standard (1910.147) require notifying employees, shutting down equipment, and releasing stored energy — but the energy-isolating device (lockout lock) must remain in place until work is complete, not be permanently removed.

    Topic: Code Administration & Safety

  5. Q15Under OSHA's LOTO standard (29 CFR 1910.147), when may a tagout device be used in place of a lockout device?

    • AWhenever the employee prefers tags
    • BOnly when the energy-isolating device is not capable of being locked out
    • CWhen work will be completed within one shift
    • DTagout alone is never permitted
    Show answer

    ✓ Correct answer: B. Only when the energy-isolating device is not capable of being locked out

    OSHA 1910.147(c)(3) allows tagout only when the energy-isolating device cannot physically accommodate a lock. Otherwise, lockout is required because tags alone can be removed or ignored.

    Topic: Code Administration & Safety

  6. Q16A master electrician is performing maintenance on a 480 V three-phase panel. After locking out and tagging out, the next step per OSHA LOTO protocol before touching conductors is:

    • ADon rubber gloves and begin work
    • BVerify isolation by reading the permit tag
    • CCall the utility company for confirmation
    • DTest with a voltage meter to verify the circuit is de-energized
    Show answer

    ✓ Correct answer: D. Test with a voltage meter to verify the circuit is de-energized

    After LOTO is applied, OSHA requires verification that the equipment is de-energized — typically by attempting to start the equipment and/or using a calibrated test instrument. 'Try-before-touch' prevents contact with unexpectedly live conductors.

    Topic: Code Administration & Safety

  7. Q17NFPA 70E establishes the requirement for an arc-flash risk assessment before workers approach energized equipment. Who is responsible for determining the arc-flash boundary and incident energy level?

    • AThe employer, through a qualified person
    • BThe equipment manufacturer alone
    • CThe local utility company
    • DThe equipment inspector after installation
    Show answer

    ✓ Correct answer: A. The employer, through a qualified person

    NFPA 70E 130.5 requires the employer to ensure an arc-flash risk assessment is performed by a qualified person. The assessment determines incident energy and the required PPE category.

    Topic: Code Administration & Safety

  8. Q18According to NFPA 70E, what is the Restricted Approach Boundary for unqualified workers around exposed energized conductors at 480 V phase-to-phase?

    • AUnqualified workers may approach with PPE
    • B12 inches from the conductor
    • CUnqualified workers shall not cross this boundary without being continuously escorted by a qualified person
    • DNo boundary applies below 600 V
    Show answer

    ✓ Correct answer: C. Unqualified workers shall not cross this boundary without being continuously escorted by a qualified person

    NFPA 70E 130.4 establishes the Restricted Approach Boundary. Unqualified workers cannot enter this boundary unless continuously escorted and protected by a qualified person. All voltages above 50 V require boundary assessment.

    Topic: Code Administration & Safety

  9. Q19Per NFPA 70E Table 130.5(C), which PPE category is typically required when working inside the arc-flash boundary of a 480 V switchboard with doors open and bolted bus exposed, with incident energy estimated at 8 cal/cm²?

    • APPE Category 1 (minimum 4 cal/cm²)
    • BPPE Category 2 (minimum 8 cal/cm²)
    • CPPE Category 3 (minimum 25 cal/cm²)
    • DPPE Category 4 (minimum 40 cal/cm²)
    Show answer

    ✓ Correct answer: B. PPE Category 2 (minimum 8 cal/cm²)

    NFPA 70E PPE Category 2 requires arc-rated clothing and equipment with a minimum 8 cal/cm² arc rating. An estimated 8 cal/cm² incident energy falls within the Category 2 threshold.

    Topic: Code Administration & Safety

  10. Q20NEC 110.26 requires minimum working space depth in front of electrical panels operating at 120/240 V (Condition 1). What is that minimum depth?

    • A18 inches
    • B24 inches
    • C24 inches
    • D36 inches
    Show answer

    ✓ Correct answer: D. 36 inches

    NEC Table 110.26(A)(1) requires a minimum of 36 inches of working space depth (front to back) for equipment operating up to 150 V to ground under Condition 1. This space must remain clear at all times.

    Topic: Code Administration & Safety

Free practice here. Timed mocks when you are ready.

Use the free Master Electrician Exam Prep 2 sample, download the PDF, then unlock web-based timed mock exams for a full exam rehearsal.

Download PDFStart practice test