HomeOSHA 10 Hour Safety PrepQuestions 21–30
OSHA 10 Hour SafetyPart 3 of 3

OSHA 10 Hour Safety Exam Questions & Answers 2026 (21–30)

OSHA 10 Hour Safety practice questions and answers 2026. Tap an option to test yourself — you'll see the correct answer and a plain-English explanation for every question. Free, no login.

Practise OSHA 10 Hour Safety questions free, download the PDF, or unlock timed mock exams when you are ready.
Download PDFWatch video
Multiple choice — pick the best answer, then reveal it
  1. Q21What is the required top-rail height for a guardrail system installed on a construction worksite?

    • A36 inches
    • B48 inches
    • C42 inches
    • D39 inches
    Show answer

    ✓ Correct answer: C. 42 inches

    29 CFR 1926.502(b)(1) specifies that the top edge of a guardrail must be 42 inches (plus or minus 3 inches) above the walking-working surface.

    Topic: OSHA 10-Hour Construction

  2. Q22Per OSHA's Construction standard, safety nets used as fall protection must be installed no more than how far below the working surface where workers may fall?

    • A30 feet
    • B10 feet
    • C40 feet
    • D20 feet
    Show answer

    ✓ Correct answer: A. 30 feet

    29 CFR 1926.502(c)(1) requires safety nets to be installed as close as practicable under the walking-working surface but no more than 30 feet below it.

    Topic: OSHA 10-Hour Construction

  3. Q23At what height above a lower level does OSHA require fall protection for workers on supported scaffolds?

    • A6 feet
    • B4 feet
    • C15 feet
    • D10 feet
    Show answer

    ✓ Correct answer: D. 10 feet

    29 CFR 1926.451(g)(1) requires fall protection for employees on scaffolds more than 10 feet above a lower level, which is a higher threshold than the general 6-foot rule.

    Topic: OSHA 10-Hour Construction

  4. Q24After a personal fall arrest system has arrested a worker's fall, what must happen before the equipment is used again?

    • AOnly the anchorage connector needs re-certification; the harness and lanyard are reusable
    • BThe worker who fell must certify in writing that the harness feels undamaged
    • CThe lanyard must be replaced but the harness may be reused after a visual check
    • DThe entire system must be removed from service and inspected by a competent person before reuse
    Show answer

    ✓ Correct answer: D. The entire system must be removed from service and inspected by a competent person before reuse

    29 CFR 1926.502(d)(20) requires that any personal fall arrest system subjected to impact loading during a fall be immediately removed from service until a competent person inspects it and determines it is undamaged and suitable for reuse.

    Topic: OSHA 10-Hour Construction

  5. Q25A hole in a walking-working surface is covered with a temporary wooden cover. Under OSHA standards, that cover must be able to support at least how much weight?

    • AThe dead load of materials stored on the cover plus 250 pounds for a worker
    • BTwice the weight of employees, equipment, and materials that may be imposed on it at any one time
    • CThe actual weight of any single worker who may step on it
    • D1,000 pounds per square foot of cover area
    Show answer

    ✓ Correct answer: B. Twice the weight of employees, equipment, and materials that may be imposed on it at any one time

    29 CFR 1926.502(i)(2) requires floor-hole covers to support without failure at least twice the weight of employees, equipment, and materials that could be imposed on the cover at any one time.

    Topic: OSHA 10-Hour Construction

  6. Q26A leading-edge employer determines that conventional fall protection (guardrails, PFAS, and safety nets) is infeasible and would create a greater hazard. What does OSHA specifically require before that employer may proceed with an alternative fall protection plan?

    • AFile a formal variance petition with the OSHA Area Director and obtain written approval before work begins
    • BPost a safety monitor and install warning lines no closer than 10 feet from all unprotected edges
    • CReduce the crew to no more than four workers at the leading edge and schedule work only during daylight hours
    • DHave a qualified person prepare a written, site-specific alternative fall protection plan that is maintained at the job site
    Show answer

    ✓ Correct answer: D. Have a qualified person prepare a written, site-specific alternative fall protection plan that is maintained at the job site

    29 CFR 1926.502(k) permits an alternative fall protection plan for leading-edge work only when conventional methods are infeasible or create a greater hazard, and requires the plan to be written, site-specific, prepared by a qualified person, and kept at the job site.

    Topic: OSHA 10-Hour Construction

  7. Q27Which specific combination of fall protection is OSHA required for workers on two-point adjustable suspension scaffolds?

    • APersonal fall arrest system alone, because guardrails interfere with suspension scaffold operations
    • BSafety net below the scaffold platform and a safety monitor at the roofline
    • CBoth a personal fall arrest system and a guardrail system
    • DGuardrail system alone, provided the platform width does not exceed 24 inches
    Show answer

    ✓ Correct answer: C. Both a personal fall arrest system and a guardrail system

    29 CFR 1926.451(g)(3) explicitly requires workers on two-point adjustable suspension scaffolds to be protected by both a personal fall arrest system and a guardrail system due to the heightened hazard of that scaffold type.

    Topic: OSHA 10-Hour Construction

  8. Q28Under the OSHA Construction fall protection standard, which statement correctly describes when an employer may use a safety monitoring system as the sole means of fall protection?

    • AOn any low-slope roof work as long as the safety monitor is a competent person
    • BOn any construction surface provided the safety monitor-to-worker ratio does not exceed one monitor for every ten workers
    • COnly on low-slope roofs when other fall protection methods have been demonstrated infeasible, and it must be used together with a warning line system except in areas too small to erect one
    • DWhenever guardrails would obstruct the work and the employer documents the reason in the daily safety log
    Show answer

    ✓ Correct answer: C. Only on low-slope roofs when other fall protection methods have been demonstrated infeasible, and it must be used together with a warning line system except in areas too small to erect one

    29 CFR 1926.502(h) and (j) limit safety monitoring systems to low-slope roof work where other protection is infeasible, and generally require them to be combined with a warning line system; the monitor may serve as sole protection only in areas too small or too close to an edge to use a warning line.

    Topic: OSHA 10-Hour Construction

  9. Q29What is the primary purpose of a Ground-Fault Circuit Interrupter (GFCI) on a construction site?

    • ATo prevent overloading of electrical circuits by shutting off power when current exceeds the breaker rating
    • BTo replace the need for extension cords by providing additional outlets near the work area
    • CTo detect a difference in current between the hot and neutral conductors and shut off power before a fatal shock can occur
    • DTo ground all metal tool housings so that stray voltage is safely routed to earth
    Show answer

    ✓ Correct answer: C. To detect a difference in current between the hot and neutral conductors and shut off power before a fatal shock can occur

    A GFCI monitors the difference between current on the hot and neutral conductors; if an imbalance of approximately 5 milliamps is detected — indicating current is flowing through a person — it trips within milliseconds, as required by 29 CFR 1926.404(b)(1).

    Topic: OSHA 10-Hour Construction

  10. Q30Under 29 CFR 1926 Subpart K, which of the following best describes when lockout/tagout (LOTO) procedures must be applied on a construction site?

    • AOnly when working on circuits rated at 480 volts or higher
    • BWhenever an employee must perform work on or near energized electrical equipment where unexpected energization or startup could cause injury
    • COnly when the employer has not yet installed a permanent GFCI system
    • DOnly during initial installation of new electrical equipment before the first power-up
    Show answer

    ✓ Correct answer: B. Whenever an employee must perform work on or near energized electrical equipment where unexpected energization or startup could cause injury

    29 CFR 1926.417 requires that sources of electrical energy be de-energized and locked or tagged out before employees work on or near them to prevent unexpected energization, startup, or release of stored energy.

    Topic: OSHA 10-Hour Construction

Free practice here. Timed mocks when you are ready.

Use the free OSHA 10 Hour Safety Prep sample, download the PDF, then unlock web-based timed mock exams for a full exam rehearsal.

Download PDFStart practice test