HomeSolar PV Professional ExamQuestions 11–20
Solar PV Professional ExamPart 2 of 3

Solar PV Professional Exam Exam Questions & Answers 2026 (11–20)

Solar PV Professional Exam practice questions and answers 2026. Tap an option to test yourself — you'll see the correct answer and a plain-English explanation for every question. Free, no login.

Practise Solar PV Professional Exam questions free, download the PDF, or unlock timed mock exams when you are ready.
Multiple choice — pick the best answer, then reveal it
  1. Q11Which of the following grounding methods is required for a PV array mounted on a metal roof?

    • ANo grounding required due to metal roof contact
    • BA grounding electrode conductor connected to the building's grounding electrode system
    • CIsolated ground separate from building ground
    • DBonding to metal roof structure only
    Show answer

    ✓ Correct answer: B. A grounding electrode conductor connected to the building's grounding electrode system

    A grounding electrode conductor connected to the building's grounding electrode system is required for PV arrays on metal roofs to ensure proper grounding and safety.

  2. Q12What personal protective equipment (PPE) is required when working with batteries in a PV system installation?

    • ASafety glasses, face shield, chemical-resistant gloves, and protective clothing
    • BOnly insulated gloves
    • CStandard work gloves and a hard hat
    • DNo special PPE is required for battery work
    Show answer

    ✓ Correct answer: A. Safety glasses, face shield, chemical-resistant gloves, and protective clothing

    Safety glasses, face shield, chemical-resistant gloves, and protective clothing are required PPE when working with batteries to protect against chemical exposure and electrical hazards.

  3. Q13When installing conduit for PV source circuits on a flat roof, what is the required support spacing for rigid metal conduit?

    • AEvery 6 feet
    • BEvery 3 feet
    • CEvery 15 feet
    • DEvery 10 feet
    Show answer

    ✓ Correct answer: D. Every 10 feet

    Rigid metal conduit requires support at intervals not exceeding 10 feet as specified by NEC to prevent sagging and maintain structural integrity.

  4. Q14What is the correct procedure for installing PV modules in areas with high wind loads?

    • AAlways use ballasted mounting only
    • BInstall modules closer to the roof surface
    • CUse additional mounting points and follow racking manufacturer's high wind zone requirements
    • DInstall wind deflectors on all sides of the array
    Show answer

    ✓ Correct answer: C. Use additional mounting points and follow racking manufacturer's high wind zone requirements

    Using additional mounting points and following the racking manufacturer's high wind zone requirements ensures secure installation in high wind areas and prevents module damage.

  5. Q15According to NEC 2017, what is required for labeling a PV system disconnect?

    • ATemporary paper signs
    • BReflective, permanently attached signs with minimum 3/8-inch letters
    • CAny color sign with 1/4-inch letters
    • DLaminated labels attached with adhesive tape
    Show answer

    ✓ Correct answer: B. Reflective, permanently attached signs with minimum 3/8-inch letters

    NEC 2017 requires that PV system disconnects be labeled with reflective, permanently attached signs with minimum 3/8-inch letters for visibility and durability.

  6. Q16What is the proper torque specification range typically used for module-to-rail connections?

    • A10-15 ft-lbs, but always verify with manufacturer's documentation
    • BAs tight as possible with a hand tool
    • C25-30 ft-lbs for all connections
    • D5-8 ft-lbs for all module types
    Show answer

    ✓ Correct answer: A. 10-15 ft-lbs, but always verify with manufacturer's documentation

    Module-to-rail connections typically require 10-15 ft-lbs of torque, but the exact specification should always be verified with the manufacturer's documentation to ensure proper installation.

  7. Q17When installing a junction box for PV source circuits, what is the minimum working clearance required in front of the box according to NEC?

    • A18 inches
    • B1 foot
    • C5 feet
    • D3 feet
    Show answer

    ✓ Correct answer: D. 3 feet

    NEC requires a minimum working clearance of 3 feet in front of junction boxes to provide adequate space for safe access and maintenance.

  8. Q18Which of the following is a proper method for installing conductors through a building's roof?

    • ARouting through existing plumbing vents
    • BDrilling a hole and sealing with standard caulk
    • CUsing appropriate flashing and weatherproofing methods designed for electrical penetrations
    • DCreating a penetration under roof overhangs without sealing
    Show answer

    ✓ Correct answer: C. Using appropriate flashing and weatherproofing methods designed for electrical penetrations

    Using appropriate flashing and weatherproofing methods designed for electrical penetrations ensures a watertight seal and maintains the building's weather resistance.

  9. Q19What is required when installing microinverters or power optimizers in a PV system?

    • AInstalling them only on alternating modules
    • BMapping serial numbers to their physical locations in the array
    • CPositioning them only on the north side of modules
    • DConnecting multiple optimizers to each module
    Show answer

    ✓ Correct answer: B. Mapping serial numbers to their physical locations in the array

    Mapping serial numbers to physical locations is essential when installing microinverters or power optimizers for proper system monitoring and troubleshooting.

  10. Q20According to NFPA 70E, what should an installer do before working on a PV array that has been in operation?

    • AVerify the array is de-energized using proper testing equipment
    • BWait until nighttime to ensure no generation
    • CCover modules with opaque material only
    • DDisconnect only the AC side of the system
    Show answer

    ✓ Correct answer: A. Verify the array is de-energized using proper testing equipment

    NFPA 70E requires verification that the array is de-energized using proper testing equipment before beginning work to ensure worker safety from electrical hazards.