Journeyman Electrician 26 practice questions and answers 2026. Tap an option to test yourself — you'll see the correct answer and a plain-English explanation for every question. Free, no login.
Q21Where must the service disconnecting means be located?
✓ Correct answer: D. At the nearest point of entrance of the service conductors inside or outside the building
NEC 230.70(A)(1) requires the service disconnecting means to be installed at a readily accessible location, either outside the building/structure or inside nearest the point of entry of the service conductors.
Topic: Branch Circuits, Feeders & Services
Q22Branch circuit conductors must be protected by an overcurrent device at the point where:
✓ Correct answer: A. They receive their supply
Overcurrent protection for branch circuit conductors must be located at the point where the conductors receive their supply (the panelboard or source). This protects the conductors from excessive current.
Topic: Branch Circuits, Feeders & Services
Q23A single non-motor load is rated as a continuous load. The branch circuit overcurrent device must be rated at no less than:
✓ Correct answer: C. 125% of the load current
Per NEC 210.20(A), the overcurrent device for a branch circuit supplying a continuous load must have a rating of at least 125% of the continuous load current to prevent nuisance tripping during sustained operation.
Topic: Branch Circuits, Feeders & Services
Q24Under the 10-foot tap rule, which condition must be met regarding conductor ampacity?
✓ Correct answer: B. The tap conductor ampacity must be at least 10% of the feeder overcurrent device rating
NEC 240.21(B)(1) allows a 10-foot tap without overcurrent protection at the tap point if the tap conductor has an ampacity at least 1/10 (10%) of the feeder OCPD rating, the tap is in a raceway, and it terminates in a single OCPD.
Topic: Branch Circuits, Feeders & Services
Q25The 25-foot feeder tap rule (NEC 240.21(B)(2)) requires that the tap conductors have an ampacity of at least:
✓ Correct answer: D. 1/3 of the feeder OCPD rating
Under the 25-foot tap rule, the tap conductors must have an ampacity not less than 1/3 of the rating of the overcurrent device protecting the feeder conductors, and they must terminate in a single breaker or set of fuses.
Topic: Branch Circuits, Feeders & Services
Q26What is the 60°C column ampacity of 10 AWG copper in NEC Table 310.12 for residential branch circuits?
✓ Correct answer: A. 30 amperes
Per NEC Table 310.12, 10 AWG copper conductors have an ampacity of 30 amperes at 60°C, which is the temperature column used for 15- and 20-ampere residential branch circuits when termination temperature is unknown.
Topic: Branch Circuits, Feeders & Services
Q27When more than three current-carrying conductors are in a raceway, the conductor ampacity must be reduced. What correction factor applies for 4–6 current-carrying conductors in a conduit?
✓ Correct answer: C. 80% of table value
NEC Table 310.15(C)(1) specifies an 80% (0.80) adjustment factor when 4 to 6 current-carrying conductors are bundled in a raceway or cable to account for heat buildup.
Topic: Branch Circuits, Feeders & Services
Q28GFCI protection for receptacles in bathrooms of dwelling units is required by which NEC article section?
✓ Correct answer: B. NEC 210.8(A)(1)
NEC 210.8(A)(1) requires GFCI protection for all 125-volt, single-phase, 15- and 20-ampere receptacles in bathrooms of dwelling units to protect against electric shock in wet locations.
Topic: Branch Circuits, Feeders & Services
Q29GFCI protection is required for receptacles located outdoors at dwelling units when:
✓ Correct answer: D. All outdoor receptacles at dwelling units regardless of location
NEC 210.8(A)(3) requires GFCI protection for all 125-volt, 15- and 20-ampere receptacles installed outdoors at dwelling units, without restriction to specific outdoor locations.
Topic: Branch Circuits, Feeders & Services
Q30Ground-fault protection of equipment (GFPE) at the service disconnect is required for solidly grounded wye services of more than 150 volts to ground but not exceeding 600 volts phase-to-phase when the service exceeds:
✓ Correct answer: A. 1,000 amperes
NEC 230.95 requires GFPE at the service disconnect for solidly grounded wye services over 150V to ground (not exceeding 600V phase-to-phase) where the service exceeds 1,000 amperes. This protects against arcing ground faults.
Topic: Branch Circuits, Feeders & Services
Use the free Journeyman Electrician Prep 26 sample, download the PDF, then unlock web-based timed mock exams for a full exam rehearsal.